Morning,
It would be handy, if you could have the option of adding a junction box mid circuit to allow for two different types of cabling to used and the circuit then can be evaluated with both properties of the differing cable types and lengths.
I do a lot of refurbishments and temporary amendments, where i have to change the existing systems in a temporary capacity whilst the works are being undertaken.
Keep up the good work with the software!
Thanks
(https://i.postimg.cc/s1WW1FB7/OM2.png) (https://postimg.cc/s1WW1FB7)
I have just found the function to add a JB in-between!! :D
But i had to delete the meter and re-instate it as it added the JB between the MCCB and KWH meter.